Home › Weaving Calculations › Lecture 10
Weaving Calculations · Lecture 10

Warping Speed and Preparatory Capacity

From drum rpm to yards per shift, and two problems on how many warpers and sizers a loom shed needs.
Drum speedYards per shiftSizing capacityWarpers needed

Speed of a warping drum

Warping drum
AB
1Drum speed (rpm)
2Drum diameter (in)
3Shift (hours)
4Efficiency
5Revolutions per hour18,000
6Circumference (in)94.25
7Inches per hour1,696,460
8Yards per hour47,124
9Yards per shift (100%)376,991
10Yards per shift at efficiency301,593
blue = input (edit me)grey = formula (click to see it)

Problem 1 — time to fill a beam

Beam of 20,500 yd
AB
1Warping speed (m/min)
2Efficiency
3Beam length (yd)
4Ends on beam
5Count Ne
6Speed (yd/min)984
7Time to fill (min)32.5
8Yarn on beam (yd)16,400,000
9Weight on beam (lb)651
blue = input (edit me)grey = formula (click to see it)

Problem 2 — preparatory machines for 200 airjet looms

200 looms × 500 m/day of 20×16/128×60, 63" is 100,000 m of fabric a day. How many sizing machines and warpers keep them fed?

Warping & sizing capacity
AB
1Looms
2Fabric per loom per day (m)
3Warp contraction
4Ends per inch
5Width (in)
6Warper creel capacity
7Sizing speed (m/min)
8Sizing efficiency
9Warping speed (m/min)
10Warping efficiency
11Sizing
12Fabric per day (m)100,000
13Sized warp needed per day (m)110,000
14One sizing machine per day (m)108,000
15Sizing machines required1.02
16Warping
17Total ends8,064
18Warper’s beams per set10
19Yarn to be warped per day (m of beam)1,100,000
20One warper per day (m)864,000
21Warpers required1.27
blue = input (edit me)grey = formula (click to see it)
One sizing machine almost copes (1.02), but the warper must run 10 beam-lengths for every sized beam, so 1.27 warpers are needed — two warpers, or one warper with a larger creel (fewer beams per set, see Lecture 11).

Original lecture material

Open the file this page was built from: